    Hi - I misplaced the latest board minutes and can't seem to find the recent ones online.

    Does anyone know that status of the HVAC redo's in buildings 1,4,5?

    I believe 4 was redone, not sure about 1 and 5.

    Thanks in advance!

  • #2
    Re: Status of HVAC redos in buildings 1, 4, 5?

    Bldg 5 hasn't been done yet -- scheduled for December 1 thru February 24th.

    Comment


    • #3
      Re: Status of HVAC redos in buildings 1, 4, 5?

      Thanks for your reply! Anyone know about building 1?

      Comment


      • #4
        Re: Status of HVAC redos in buildings 1, 4, 5?

        I'm looking at the Penn South Announcements of November 19th:

        "HVAC remediation work is complete in Building 4, and is currently underway in Building 1. Remediation will begin in Building 5 on January 5, 2015."

        Comment


        • #5
          Re: Status of HVAC redos in buildings 1, 4, 5?

          That sound correct, I think building 1 is almost done. You can always check the minutes on the Pennsouth web page.

          Comment


          • #6
            Re: Status of HVAC redos in buildings 1, 4, 5?

            For those with their building completed HVAC, how many of you are happy with the painting job that was done. My look like its glue stuck together. Not a good sight
            .

            Comment


            • #7
              Re: Status of HVAC redos in buildings 1, 4, 5?

              Originally posted by coop member View Post
              You can always check the minutes on the Pennsouth web page.
              The most recent minutes linked on the website are from October. It doesn't appear that the minutes from November are posted yet.

              Comment


              • #8
                Re: Status of HVAC redos in buildings 1, 4, 5?

                Originally posted by chelseanewyork View Post
                For those with their building completed HVAC, how many of you are happy with the painting job that was done. My look like its glue stuck together. Not a good sight
                .
                @Chelseanewyork - was your building one of the redo ones?

                As for my apartment, while the paint job itself was ok, there were cracks in the new drywall they put up around the risers. The cracks were where the new drywall met the ceiling and existing wall. And there was one very large crack in the center of one the drywall pieces. It was gross because i saw several roaches squeezing through the cracks (never had roaches before). I had to call to get all the columns plastered and caulked and then repainted. Also the molding at the floor was not replaced correctly.

                Comment


                • #9
                  Re: Status of HVAC redos in buildings 1, 4, 5?

                  no cracks, but its just a big glob of paint all over the place. Looks like dry up yogurt stuck together.

                  Comment


                  • #10
                    Re: Status of HVAC redos in buildings 1, 4, 5?

                    They did a fantastic job for me. Guess, I'm lucky.

                    Comment


                    • #11
                      Re: Status of HVAC redos in buildings 1, 4, 5?

                      you are very lucky.